NYC DOB record · Q01184593-S1

219-48 143 Avenue

219-48 143 Avenue, Queens, NY 11413

New building filing in Laurelton, Queens. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Aug 29, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q01184593-S1

219-48 143 Avenue

Queens, NY 11413

New building · status dated Aug 26, 2026

Current record
Recorded as completed
Proposed scale
2 stories
Dwelling units
2
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q01184593-S1 as a new building at 219-48 143 Avenue, Queens, NY 11413. Its latest published status category is Recorded as completed, dated Aug 26, 2026. The filing records 2 proposed stories and 2 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Recorded as completed
Latest status date
Aug 26, 2026
Proposed scale
2 proposed stories and 2 proposed dwelling units
The building, not the filingEvery filing at BIN 4625362, with the parcel and violation record
FiledMay 31, 2025
Current recordRecorded as completed
Proposed scale2 stories
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Plumbing application filed in conjunction with nb application # q01184593-i1 for installation of a new plumbing system

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story two-family home built in 2025, on a 5,000 sq ft lot.

Built
2025
Last altered
2025
Floors
2
Residential units
2
Building type
Two-family home
Land use
One and two family homes
Zoning district
R3X
Lot area
5,000 sq ft
Building area
3,360 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 10, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 9, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q01184593-S1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,351 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q01184593-S1
BBL
4130830063
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
2
Existing dwelling units
Empty in the source
Proposed dwelling units
2
plumbing