What the filing says
A public-record reading of the proposed work.
Relocation of gas stove, k.sink, dishwasher, toilet, and lav at the 1st floor, removal of gas countertop stove (no change in use, egress or occupancy)
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2.5-story one-family home built in 1924, on a 8,000 sq ft lot.
- Built
- 1924
- Floors
- 2.5
- Residential units
- 1
- Building type
- One-family home
- Land use
- One and two family homes
- Zoning district
- R1-2
- Lot area
- 8,000 sq ft
- Building area
- 3,056 sq ft
- Historic district
- Douglaston Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 22, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 3 notices on file; the most recent was issued Aug 19, 2026.
- Construction
Issued Aug 19, 2026 — BC NOTICE OF ORDER TO STOP WORK IMMEDIATELY DUE TO APPLICANT WITHDRAW FROM THE PROJECT # Q00810670-I1 PLEASE KINDLY CONTACT THE BOROUGH COMMISSIONER AT (718-286- 7670) AS SOON AS POSSIBLE. STOP ALL WORK IMMEDIATELY AND MAKE SITE SAFE.
- Construction
Issued Jul 30, 2026 — BC NOTICE OF ORDER TO STOP WORK IMMEDIATELY DUE TO APPLICANT WITHDRAW FROM THE PROJECT # Q00810670-I1 PLEASE KINDLY CONTACT THE BOROUGH COMMISSIONER AT (718-286- 7670) AS SOON AS POSSIBLE. STOP ALL WORK IMMEDIATELY AND MAKE SITE SAFE.
- Construction
Issued Jul 30, 2026 — BC NOTICE OF ORDER TO STOP WORK IMMEDIATELY DUE TO APPLICANT WITHDRAW FROM THE PROJECT # Q08055092-I1 PLEASE KINDLY CONTACT THE BOROUGH COMMISSIONER AT (718-286- 7670) AS SOON AS POSSIBLE. STOP ALL WORK IMMEDIATELY AND MAKE SITE SAFE.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 22, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q00810670-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 23 days of being filed and a quarter take longer than 4 months, measured across 99,692 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q00810670-I1
- BBL
- 4080460053
- Postal code
- 11363 · 57 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 1
- Proposed dwelling units
- 1