NYC DOB record · B00479967-I1

222 East 17 Street

222 East 17 Street, Brooklyn, NY 11226

Alteration filing in Flatbush, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00479967-I1

222 East 17 Street

Brooklyn, NY 11226

Alteration filing · status dated Oct 12, 2021

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
76
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00479967-I1 as a alteration filing at 222 East 17 Street, Brooklyn, NY 11226. Its latest published status category is Recorded as completed, dated Oct 12, 2021. The filing records 76 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Oct 12, 2021
Proposed scale
76 proposed dwelling units
Complete building dossierView all 3 filings associated with BIN 3117573Applicant of recordSee the 221 filings that name New York Engineering ASSOC., P.C.
FiledMay 3, 2021
Current recordRecorded as completed
Proposed scale76 units
Recorded cost$133,000

What the filing says

A public-record reading of the proposed work.

Replace boiler and gas/oil burner.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story elevator apartment building built in 1958, with 76 homes, on a 20,000 sq ft lot.

Built
1958
Floors
6
Residential units
76
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R7A
Lot area
20,000 sq ft
Building area
90,289 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 7 open notices on record for this building, out of 30 notices on file; the most recent was issued Sep 10, 2024.

  • Construction

    Issued Sep 10, 2024 — OBSERVED DETERIORATED STEEL LINTEL/ANGLE IRON DETACHED FROM BUILDING LOOSE MORTAR IN DANGER OF FALLING TO GRADE AT APT.1J EXTERIOR BALCONY EXP.1 (FRONT OF BUILDING) 2ND STORY LEVEL. ALSO OBSERVED UNSECURED LINTEL/ANGLE IRON TWISTING OUTWARD AT APT.2J EXTERIOR BALCONY AT EXP.1 (FRONT OF BUILDING), 3RD STORY LEVEL. VACATE BALCONIES AT APT 1J AND

  • No report and / or late filing (facade)

    Issued Feb 22, 2023 — FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023

  • Facade safety program

    Issued Sep 13, 2018

  • 4 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00479967-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00479967-I1
BBL
3051200026
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
76
Proposed dwelling units
76