NYC DOB record · M01457512-I1

222 West 83 Street

222 West 83 Street, Manhattan, NY 10024

Alteration filing in Upper West Side (Central), Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 13, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01457512-I1

222 West 83 Street

Manhattan, NY 10024

Alteration filing · status dated Sep 11, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
113
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01457512-I1 as a alteration filing at 222 West 83 Street, Manhattan, NY 10024. Its latest published status category is Approved, dated Sep 11, 2026. The filing records 113 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 11, 2026
Proposed scale
113 proposed dwelling units
Applicant of recordSee the 141 filings that name Rigid Structural Design, LLC
FiledSep 10, 2026
Current recordApproved
Proposed scale113 units
Recorded cost$5,000

What the filing says

A public-record reading of the proposed work.

Installation of a temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 17-story elevator apartment building built in 1924, with 113 homes, on a 14,375 sq ft lot.

Built
1924
Last altered
1981
Floors
17
Residential units
113
Building type
Elevator apartment building
Land use
Mixed residential and commercial
Zoning district
C4-6A
Lot area
14,375 sq ft
Building area
165,452 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 13, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 20 open notices on record for this building, out of 122 notices on file; the most recent was issued Sep 24, 2024.

  • Construction

    Issued Sep 24, 2024 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. EXPOSURE # 1 N ELEVATION:DAMAGED,SPALLED,BROKEN BRICK @ 8FL CORRODED & SAGGING LINTEL ADDITIONAL SAGGING,CORRODED METAL LINTELS ON 9FL,MISSING MORTAR JOINTS EXP#2 E,SECTION OF PARAPET & 15FL BRICKS COVERED WITH PLASTIC HOOKS REMEDY:REPAIR AND/OR REPLACE DAMAGED FACADE AND APPURTANCES

  • Failure to submit

    Issued Jun 23, 2024 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023)

  • Construction

    Issued Apr 30, 2024 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.OBSERVED AT EXP2 EAST ELEV AREA OF MISSING PARAPET WALL COVER WITH PLASTIC.EXP3 SOUTH E LEV CRACK PARAPET AT GROUND LEVEL SET BACK.REMEDY:REPAIR AND/OR REPL

  • 17 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 13, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01457512-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01457512-I1
BIN
1032769
BBL
1012300043
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
113
Proposed dwelling units
113