NYC DOB record · B00581895-I1

2223 86 Street

2223 86 Street, Brooklyn, NY 11214

Alteration filing in Gravesend (West), Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00581895-I1

2223 86 Street

Brooklyn, NY 11214

Alteration filing · status dated Jan 3, 2022

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
2
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00581895-I1 as a alteration filing at 2223 86 Street, Brooklyn, NY 11214. Its latest published status category is Recorded as completed, dated Jan 3, 2022. The filing records 2 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Jan 3, 2022
Proposed scale
2 proposed dwelling units
The building, not the filingEvery filing at BIN 3165952, with the parcel and violation recordApplicant of recordSee the 334 filings that name J&r Design And Inspection CORP.
FiledAug 24, 2021
Current recordRecorded as completed
Proposed scale2 units
Recorded cost$10,000

What the filing says

A public-record reading of the proposed work.

Interior and exterior renovation at cellar and 1st floor of exist. mixed use building with, relocate/replace/new refrigeration and air conditioning systems as per plan. no change in use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 3-story mainly residential with some commercial built in 1919, on a 2,000 sq ft lot.

Built
1919
Last altered
2010
Floors
3
Residential units
2
Building type
Mainly residential with some commercial
Land use
Mixed residential and commercial
Zoning district
R5
Lot area
2,000 sq ft
Building area
3,120 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 2 open notices on record for this building, out of 10 notices on file; the most recent was issued Aug 12, 1997.

  • Construction

    Issued Aug 12, 1997 — WORK WITHOUT A PERMIT. HAVING PLACED A DOOR AT SECOND FLOOR HALL AREA TO THIRD FLOOR APARTMENT BY STAIRWAY (2) HAVING REMOVED FRONT DOOR TO APARTMENT ENTRANCE AT THIRD FLOOR REMEDY: REMOVE ILLEGALDOOR AT 2ND FLOOR HALLWAY TO THIRD FLOOR (2) REPLACE FRONT DOOR TO APARTMENT AT THIRD FLOOR

  • Local law 62/91 - boilers

    Issued Aug 16, 1993

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00581895-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00581895-I1
BBL
3063480069
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
2
Proposed dwelling units
2
mechanical