What the filing says
A public-record reading of the proposed work.
Installation of heavy-duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 NYC building code.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story walk-up apartment building built in 1915, with 13 homes, on a 2,554 sq ft lot.
- Built
- 1915
- Last altered
- 1986
- Floors
- 4
- Residential units
- 13
- Building type
- Walk-up apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- R8B
- Lot area
- 2,554 sq ft
- Building area
- 8,800 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 30, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 26 notices on file; the most recent was issued May 26, 2026.
- Construction
Issued May 26, 2026 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTE AT TIME OF INSPECTION,OBSERVED THE FOLLOWING CONDITIONS:CRACK AND SPALLED MASONRY AT THE PARAPET OF EXPOSURE 1.REMEDY:REPAIR AND/OR REPLACE
- Construction
Issued May 1, 2026 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTE: OBSERVED THE FOLLOWING CONDITIONS AT EXPOSURE 1: SPAWLING MASONRY OF PARAPIT, DEFLATION AND CORROSION OF WINDOW LENTILS AND METAL CORROSION OF FIRE ESCAPE. REMEDY: REPAIR AND/OR REPLACE
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 30, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01480175-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 89,584 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01480175-I1
- BIN
- 1044024
- BBL
- 1014290012
- Postal code
- 10021 · 799 filings
- Review type
- Professional Certification
- Existing stories
- 4
- Proposed stories
- 4
- Existing dwelling units
- 13
- Proposed dwelling units
- 13