NYC DOB record · M01216165-P1

223 East 85 Street

223 East 85 Street, Manhattan, NY 10028

Alteration filing in Upper East Side-Yorkville, Manhattan. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Aug 29, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01216165-P1

223 East 85 Street

Manhattan, NY 10028

Alteration filing · status dated Aug 25, 2026

Current record
Approved
Proposed scale
7 stories
Dwelling units
28
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01216165-P1 as a alteration filing at 223 East 85 Street, Manhattan, NY 10028. Its latest published status category is Approved, dated Aug 25, 2026. The filing records 7 proposed stories and 28 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Aug 25, 2026
Proposed scale
7 proposed stories and 28 proposed dwelling units
The building, not the filingwhat it sold for, apartment sizes, the owner of record and every filing at BIN 1048766
FiledAug 8, 2026
Current recordApproved
Proposed scale7 stories
Recorded cost$252,560

What the filing says

A public-record reading of the proposed work.

Herewith submitting a filing to increase the scope of work to facade repairs and limited roof repairs to the bulkhead area, as indicated on the plans filed . There will be no change in use or occupancy or Egress.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 7-story walk-up apartment building built in 1920, with 28 homes, on a 2,477 sq ft lot.

Built
1920
Last altered
1983
Floors
7
Residential units
28
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R8B
Lot area
2,477 sq ft
Building area
13,459 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 1, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 5 open notices on record for this building, out of 11 notices on file; the most recent was issued Mar 13, 2025.

  • Construction

    Issued Mar 13, 2025 — FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION IT WAS OBSERVED AT EXPOSURE 1 (SOUTH ELEV) A DISLODGE BRICK MASONRY. EXP4 (EAST ELEV) A VERTICAL CRACK SPANNING APPROXIMATEL 5 TO 7 FEET LONG WAS OBSERVED. REMEDY: REPAIR AND/OR REPLACE

  • No report and / or late filing (facade)

    Issued Feb 22, 2024 — FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024

  • Fail to certify class

    Issued Aug 22, 2019 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

  • 2 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01216165-P1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01216165-P1
BBL
1015310013
Review type
Standard Plan Examination
Existing stories
7
Proposed stories
7
Existing dwelling units
28
Proposed dwelling units
28
General constructionStructural work