NYC DOB record · M01314319-I1

2235 Frederick Douglass Boulevard

2235 Frederick Douglass Boulevard, Manhattan, NY 10027

Alteration filing in Harlem (South), Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 10, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01314319-I1

2235 Frederick Douglass Boulevard

Manhattan, NY 10027

Alteration filing · status dated Oct 8, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01314319-I1 as a alteration filing at 2235 Frederick Douglass Boulevard, Manhattan, NY 10027. Its latest published status category is Approved, dated Oct 8, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 8, 2026
Proposed scale
Not stated in this filing
Applicant of recordSee the 70 filings that name Queens Engineering
FiledNov 6, 2025
Current recordApproved
Proposed scaleNot specified
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Outriggers system and hoist installation for facade repairs. no change in use, egress, or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 8-story condominium built in 2003, with 74 homes, on a 20,570 sq ft lot.

Built
2003
Floors
8
Residential units
74
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
R8A
Lot area
20,570 sq ft
Building area
100,359 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 10, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 16 open notices on record for this building, out of 42 notices on file; the most recent was issued May 16, 2026.

  • Construction

    Issued May 16, 2026 — (2235 FREDERICK DOUGLAS BLVD). FAILURE TO MAINTAIN BUILDING EXTERIOR WALLS & APPURTANENCES IN A CODE COMPLIANT MANNER. AT TIME OF INSPECTION, OBSERVED CRACKED DEFECTED MORTAR JOINTS MULTI-LOCATIONS @ EXPOSURES 1 AND 4, EAST, NORTH ELEVATIONS. REMEDY: OWNER TO REPAIR AND OR REPLACE

  • Construction

    Issued May 16, 2026 — (2490 FREDERIC DOUGLAS BLVD) FTM BLDG EXTER WALLS& APPURT. OBSRVD STEPCRACKS, DISLODGE MASONRY BRICKS, OPEN MORTAR JOINTS, DEFECTED MORTAR JOINTS, DAMAGED METAL CORNICE @ EXP 1W ELEV. OBSRVD STEPCRACKS BRICKS, CRACKING STONE MASONRY DECOR MULTILOCATNS, DAMAGED MASONRY BRICKS WALL @ EXP 4 S ELEV. REMEDY:OWNER TO REPAIR AND OR REPLACE

  • Construction

    Issued Jan 11, 2024 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.CRACKED/SEPARATE MORTAR JOINTS ON ALL EXPO. IN MULTIPLE LOCATIONS.ALSO BULGING/STONE MOVEMENT.AT CORNER OF EXP#1&4(EAST&NORTH ELEVATION AT PARAPET LEVEL REMEDY:FIX AND/OR REPLACE

  • 13 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 10, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01314319-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 78,679 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01314319-I1
BIN
1086186
BBL
1019477501
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
Empty in the source
Proposed dwelling units
Empty in the source