What the filing says
A public-record reading of the proposed work.
App filed to remove and reinstall the 2 exist. 1st fl apts and mechanical spaces in coordination with the phased masonry foundation repair work below the 1st fl. The entire building will be vacated during construction. Interior partitions on flrs 2 to 4.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story condominium built in 1995, with 14 homes, on a 5,008 sq ft lot.
- Built
- 1995
- Last altered
- 2024
- Floors
- 4
- Residential units
- 14
- Building type
- Condominium
- Land use
- Walk-up apartments
- Zoning district
- R6B
- Lot area
- 5,008 sq ft
- Building area
- 9,054 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 29, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 9 notices on file; the most recent was issued Apr 17, 2024.
- Construction
Issued Apr 17, 2024 — FAILURE TO MAINTAIN BUILDING. OBSERVED STRUCTURAL STABILITY ISSUES THROUGHOUT THE BUILDING. UNSAFE TO OCCUPY. FULL VACATE ISSUED FOR ENTI RE BUILDING
- Construction
Issued Apr 17, 2024 — FAILURE TO MAINTAIN.AT TIME OF INSPECTION,OBSRVD INTERIOR BEARNG WALLS OF BLDG SETTLED&CRCKD.OBSRVD 1"WIDE STEP CRACKS IB BLACKWALLS.OBSRVD FLRS AT OF LVL UP TO 5" PER ROOM.OBSRVD DOORS&WALLS SHIFTD.OWNR TO ENGAGE NYSPE&ENDRSD CNTRCTR TO EVAL THE ENT BLDG&RPAIR UNDR PRMT.STRT WRK UNDR PRMT BY 5/9/24
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 29, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00846046-P1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 88,832 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00846046-P1
- BBL
- 3006467501
- Postal code
- 11232 · 1675 filings
- Review type
- Standard Plan Examination
- Existing stories
- 4
- Proposed stories
- 4
- Existing dwelling units
- 14
- Proposed dwelling units
- 14