What the filing says
A public-record reading of the proposed work.
Application filed to address Partial Vacate Order (Complaint 1722555) and ECBs 39184724H, 39184723X, 39184722Y, 34775256Z. Application supersedes SP Worktype filed under ALT 2 # 140595390. Remove Fire Watch. No Change of Use, Egress or Occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story office building built in 1848, with 3 homes, on a 7,641 sq ft lot.
- Built
- 1848
- Last altered
- 1956
- Floors
- 6
- Residential units
- 3
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- M1-5/R10
- Lot area
- 7,641 sq ft
- Building area
- 44,034 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 16, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 42 open notices on record for this building, out of 117 notices on file; the most recent was issued Apr 20, 2026.
- Construction
Issued Apr 20, 2026 — FAILURE TO MAINTAIN BLDG IN SAFE MANNER.@CELLAR&SUBCELLAR LEVELS,CRCKD WALLS&WALLS W/MISSNG BRCKS WERE OBSRVD.CHIMNEY@ROOF NEAR THE MIDDLE OF EXP4WALL HAD MULT CRCKS&WAS STRAPPED.CELLAR&SUBCELLAR.1.OWNR TO RTAIN NYSPE TO EVAL ENT STRCTRE&FILE RPAIR DWGS W/DOB, 2.BLDG TO BE PERM RPAIRD UNDR PRMT STRTNG BY 6/1/2026
- Construction
Issued Apr 20, 2026 — EMERGENCY WORK ORDER.@CELLAR&SUBCELLAR LVLS,CRCKD WALLS &WALLS W/ MISSNG BRCKS WERE OBSRVD.CHIMNEY@ROOF NEAR THE MIDDLE OF EXP4 HAD MULT CRCKS&WAS STRAPPD.CELLAR&SUBCELLAR LVLS HAD PRE-EXISTNG.OWNR TO RTAIN NYSPE&GC REG W/DOB TO IMMED 1.NYSPE TO SUBMIT MEANS&METHDS FOR TEMP SHORNG/STBLIZTN OF CHIMNEY&SIDEWALK
- Plumbing
Issued Apr 15, 2026 — OBSERVED IN THE BASEMENT WATER LEAKING FROM SPRINKLER SYSTEM PIPE ONTO THE FLOOR
39 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 16, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01449603-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 81,398 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01449603-I1
- BIN
- 1003065
- BBL
- 1002350013
- Postal code
- 10013 · 755 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 8
- Proposed dwelling units
- 8