What the filing says
A public-record reading of the proposed work.
Interior renovation on the 1st floor
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 44-story office building built in 1927, on a 16,409 sq ft lot.
- Built
- 1927
- Floors
- 44
- Residential units
- 0
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- C5-3
- Lot area
- 16,409 sq ft
- Building area
- 480,831 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 30, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 13 open notices on record for this building, out of 295 notices on file; the most recent was issued May 11, 2026.
- Elevator
Issued May 11, 2026 — VF.. CEASE USED.. WATER DAMEGE ON ELEVATOR . REPAIR AND CONTACT DOB AT EIR @BUILDINGS.NYC.GOV. AND 2123932435.. TO RETURN DEVICE TO SERVICE...
- Elevator
Issued May 11, 2026 — VF CEASE USED.. WATER DAMEGE ON ELEVATOR . REPAIR AND CONTACT DOB AT EIR @BUILDINGS.NYC.GOV. AND 2123932435. TO RETURN DEVICE TO SERVICE...
- Elevator
Issued May 11, 2026 — VF CEASE USED. WATER DAMEGE ON ELEVATOR REPAIR AND CONTACT DOB EIR @BUILDINGS.NYC.GOV AND 2123932435.. TO RETURN DEVICE TO SERVICE...
10 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 30, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01464283-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 72,082 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01464283-I1
- BIN
- 1001241
- BBL
- 1000880018
- Postal code
- 10007 · 152 filings
- Review type
- Professional Certification
- Existing stories
- 44
- Proposed stories
- 44
- Existing dwelling units
- 0
- Proposed dwelling units
- 0








