NYC DOB record · M08035017-I1

225 East 28 Street

225 East 28 Street, Manhattan, NY 10016

Alteration filing in Murray Hill-Kips Bay, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 21, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M08035017-I1

225 East 28 Street

Manhattan, NY 10016

Alteration filing · status dated Nov 19, 2026

Current record
Approved
Proposed scale
5 stories
Dwelling units
11
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M08035017-I1 as a alteration filing at 225 East 28 Street, Manhattan, NY 10016. Its latest published status category is Approved, dated Nov 19, 2026. The filing records 5 proposed stories and 11 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Nov 19, 2026
Proposed scale
5 proposed stories and 11 proposed dwelling units
Applicant of recordSee the 554 filings that name Ashraf Corporation
FiledDec 4, 2022
Current recordApproved
Proposed scale5 stories
Recorded cost$50,000

What the filing says

A public-record reading of the proposed work.

Repair and patch all damage caused by electrical work done at the cellar, 1st thru 5th floor hallways. no change in use, egress, or occupancy under this filing.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 5-story walk-up apartment building built in 1900, with 10 homes, on a 1,810 sq ft lot.

Built
1900
Floors
5
Residential units
10
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R8B
Lot area
1,810 sq ft
Building area
6,675 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 21, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M08035017-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 23 days of being filed and a quarter take longer than 4 months, measured across 99,111 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M08035017-I1
BIN
1019893
BBL
1009090013
Review type
Standard Plan Examination
Existing stories
5
Proposed stories
5
Existing dwelling units
11
Proposed dwelling units
11
General construction