NYC DOB record · B00526668-I1

225 Foster Avenue

225 Foster Avenue, Brooklyn, NY 11230

Alteration filing in Flatbush (West)-Ditmas Park-Parkville, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00526668-I1

225 Foster Avenue

Brooklyn, NY 11230

Alteration filing · status dated Apr 28, 2025

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
37
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00526668-I1 as a alteration filing at 225 Foster Avenue, Brooklyn, NY 11230. Its latest published status category is Recorded as completed, dated Apr 28, 2025. The filing records 37 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Apr 28, 2025
Proposed scale
37 proposed dwelling units
Applicant of recordSee the 404 filings that name Kmb Design Group, LLC
FiledJul 8, 2021
Current recordRecorded as completed
Proposed scale37 units
Recorded cost$62,800

What the filing says

A public-record reading of the proposed work.

VERIZON. Relocate 1 antenna, replace 1 antenna & 4 RRHs, replace/relocate 1 antenna, install 2 antennas, remove 1 cabinet & install 1 equipment platform with cabinets on roof. In conformance with TPPN 5/98. No change in use, egress, or occupancy

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story walk-up apartment building built in 1931, with 37 homes, on a 10,040 sq ft lot.

Built
1931
Floors
4
Residential units
37
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R5
Lot area
10,040 sq ft
Building area
28,000 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 15, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00526668-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00526668-I1
BIN
3128050
BBL
3054260045
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
37
Proposed dwelling units
37
antenna