What the filing says
A public-record reading of the proposed work.
Parapet reconstruction as per plans to address DOB violation. no change in use, egress, or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story walk-up apartment building built in 1926, with 43 homes, on a 9,500 sq ft lot.
- Built
- 1926
- Floors
- 5
- Residential units
- 43
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R8
- Lot area
- 9,500 sq ft
- Building area
- 37,056 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 18, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 8 notices on file; the most recent was issued Sep 16, 2026.
- Construction
Issued Sep 16, 2026 — CORRECTIVE ACTION PLAN REQ'D-OBSVD HAZ CONDITIONS AT FRONT ELEVATION/ EXP1 OUTSIDE CORNER FACING COURTYARD MAIN ENTRANCE INTO THE BLDG, CRACKED MORTAR AND PARTLY DISLODGED BRICKS ALONG THE PARAPET WALL CORNER PSOING A RISK OF COLLAPSE TO PEDESTRIANS. OWNER TO RETAIN DOB& NYS TO EVAL ENTIRE BLDG AND SUBMIT A CORRECTIVE ACTION PLAN
- Construction
Issued Sep 16, 2026 — EMERGENCY WORK ORDER-IMMED HAZ CONDITION, LARGE VERT CRACK AT PARAPET EXP1, PARAPET ISLEANING INWARD AND UNSTABLE/AT RISK OF COLLAPSE OWNER TO IMMED RETAIN DOB REG CONTRACTOR TO INSTALL A SIDEWALK SHED ALONG THE FULL LENGTH OF EXP1 INCLUDING INSIDE THE COURTYARD. START WORK IMMEDIATELY AND CONTINUE DAILY UNTIL COMPLETE
- Construction
Issued Sep 16, 2026 — FTM BLDG IN A CODE COMPLIANT MANNER-OBSVD LARGE VERT CRACK BRICK AT EXP1 NEAR CORNER OF COURTYARD ON SIDE CLOSEST TO EXP2. AN ANNUAL PARAPET OBSERVATION REPORT IS TO BE COMPLETED ANNUALLY STARTING IN 2024. SUBMIT PARAPET OBSERVATION REPORT FOR 2025 TO BE REC'D BY DOB NO LATER THAN 9/30/2026
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 13, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01477531-I1.
- Current status updated02
The latest recorded filing status is “Pending Prof Cert QA Assignment.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 97,160 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01477531-I1
- BBL
- 2031820008
- Postal code
- 10453 · 390 filings
- Review type
- Professional Certification
- Existing stories
- 5
- Proposed stories
- 5
- Existing dwelling units
- 43
- Proposed dwelling units
- 43








