What the filing says
A public-record reading of the proposed work.
Remove existing partition wall and install new bathroom fixtures, new door thresholds.repair and patch existing walls, and floor as required. install new floor and wall finishes
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story educational building built in 1930, on a 27,800 sq ft lot.
- Built
- 1930
- Floors
- 5
- Residential units
- 0
- Building type
- Educational building
- Land use
- Public facilities and institutions
- Zoning district
- R6
- Lot area
- 27,800 sq ft
- Building area
- 103,000 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 9 open notices on record for this building, out of 55 notices on file; the most recent was issued Sep 23, 2024.
- Low pressure boiler
Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
- Elevator annual inspection /
Issued Apr 5, 2019 — VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
- (other bldgs types) - elevator affirmation of
Issued Jan 26, 2018 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
6 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00612077-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00612077-I1
- BBL
- 3035410001
- Postal code
- 11212 · 2132 filings
- Review type
- Standard Plan Examination
- Existing stories
- 5
- Proposed stories
- 5
- Existing dwelling units
- 0
- Proposed dwelling units
- 0