NYC DOB record · M01250406-I1

226 West 50 Street

226 West 50 Street, Manhattan, NY 10019

Alteration filing in Midtown-Times Square, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 3, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01250406-I1

226 West 50 Street

Manhattan, NY 10019

Alteration filing · status dated Oct 1, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
140
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01250406-I1 as a alteration filing at 226 West 50 Street, Manhattan, NY 10019. Its latest published status category is Approved, dated Oct 1, 2026. The filing records 140 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 1, 2026
Proposed scale
140 proposed dwelling units
Applicant of recordSee the 4 filings that name Arctone Group INC. - Architects
FiledJul 16, 2025
Current recordApproved
Proposed scale140 units
Recorded cost$75,000

What the filing says

A public-record reading of the proposed work.

Proposed Plumbing Filing to Repipe Exisitgn gas Lines and Install new Gas Meter.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 8-story hotel built in 1910, on a 7,532 sq ft lot.

Built
1910
Last altered
1987
Floors
8
Residential units
0
Building type
Hotel
Land use
Commercial and office
Zoning district
C6-5
Lot area
7,532 sq ft
Building area
47,250 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 3, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01250406-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01250406-I1
BIN
1024806
BBL
1010210052
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
140
Proposed dwelling units
140