What the filing says
A public-record reading of the proposed work.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. live load 300psf.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1938, with 49 homes, on a 10,000 sq ft lot.
- Built
- 1938
- Floors
- 6
- Residential units
- 49
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R7-1
- Lot area
- 10,000 sq ft
- Building area
- 53,424 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 25, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 8 open notices on record for this building, out of 34 notices on file; the most recent was issued Aug 8, 2025.
- Construction
Issued Aug 8, 2025 — APT 6D FIRE, SMOKE AND WATER DAMAGE TO APT, WITH ROOF FULLY OPEN FROM FIRE & WATER DAMAGE TO ALL APT ON D LINE OF BUILDING. PARTIAL VACATE ORDER FOR FULL D LINE OF APT'S FROM BASEMENT TO 6TH FLOOR.
- Fail to certify class
Issued Jan 22, 2025 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
- Construction
Issued Oct 10, 2024 — PARTIAL VACATE ORDER DUE TO THE UNSAFE CONDITIONS AT EXP#2 (NORTH) & EXP#3 (EAST). OBSERVED CRACKED/DISPLACED BRICK MASONRY AND CRACKED/ LOOSE BRICK MASONRY AT MULTIPLE LOCATIONS. REMEDY: VACATED COURTYARDS AT EXPOSURES #2 - NORTH AND 3-EAST TO BE USED IN EMERGENCIES ONLY
5 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 25, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01117882-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 75,309 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01117882-I1
- BIN
- 2049739
- BBL
- 2043400001
- Postal code
- 10467 · 216 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 49
- Proposed dwelling units
- 49