NYC DOB record · M01300096-I1

227 West 42 Street

227 West 42 Street, Manhattan, NY 10036

Alteration filing in Midtown-Times Square, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 20, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01300096-I1

227 West 42 Street

Manhattan, NY 10036

Alteration filing · status dated Nov 17, 2026

Current record
Recorded as completed
Proposed scale
11 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01300096-I1 as a alteration filing at 227 West 42 Street, Manhattan, NY 10036. Its latest published status category is Recorded as completed, dated Nov 17, 2026. The filing records 11 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Nov 17, 2026
Proposed scale
11 proposed stories
The building, not the filingopen housing violations, the owner of record and every filing at BIN 1024683Applicant of recordSee the 16 filings that name M.G. Mclaren Engineering
FiledOct 21, 2025
Current recordRecorded as completed
Proposed scale11 stories
Recorded cost$36,000

What the filing says

A public-record reading of the proposed work.

Proposed remedial repairs to steel affixed to facade as per plan. no change to use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 10-story theatre built in 1999, on a 7,538 sq ft lot.

Built
1999
Floors
10
Residential units
0
Building type
Theatre
Land use
Commercial and office
Zoning district
C6-7
Lot area
7,538 sq ft
Building area
84,000 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 20, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01300096-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 23 days of being filed and a quarter take longer than 4 months, measured across 99,111 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01300096-I1
BBL
1010140017
Review type
Professional Certification
Existing stories
11
Proposed stories
11
Existing dwelling units
0
Proposed dwelling units
0
General constructionStructural work