Herewith file in conjunction with application q01199424-i1 to address violation #vio24-02509, 039145011x & 039145010y. to cap & remove plumbing equipment & fixtures. installation of new plumbing equipment, fixtures, and pipes.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 1.67-story two-family home built in 1950, on a 4,000 sq ft lot.
- Built
- 1950
- Floors
- 1.67
- Residential units
- 2
- Building type
- Two-family home
- Land use
- One and two family homes
- Zoning district
- R2A
- Lot area
- 4,000 sq ft
- Building area
- 1,384 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 1 notice on file; the most recent was issued Sep 12, 2024.
- Construction
Issued Sep 12, 2024 — RESIDENCE CONVERTED FROM A LEGAL 1-FAMILY TO A 2-FAMILY AT CELLAR LEVEL. DOB RECORDS INDICATE PREMISES TO BE A 1 FAMILY W/CELLAR AS ORDINARY. CELLAR IS NOW SETUP & ARRANGED AS AN ADDITIONAL DWELLING UNIT W/ KITCHEN W/REFRIGERATOR, MICROWAVE, RESIDENTIAL SINK & AN EATING AREA, AS WELL AS A 3PC BATHROOM & 2 BEDROOMS W/BED, PERSONAL
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01212611-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 69,387 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01212611-I1
- BIN
- 4242709
- BBL
- 4112550114
- Postal code
- 11411 · 24 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 2
- Proposed dwelling units
- 2