NYC DOB record · M01225181-I1

228 West 17 Street

228 West 17 Street, Manhattan, NY 10011

Alteration filing in Chelsea-Hudson Yards, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 26, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01225181-I1

228 West 17 Street

Manhattan, NY 10011

Alteration filing · status dated Sep 23, 2026

Current record
Recorded as completed
Proposed scale
5 stories
Dwelling units
15
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01225181-I1 as a alteration filing at 228 West 17 Street, Manhattan, NY 10011. Its latest published status category is Recorded as completed, dated Sep 23, 2026. The filing records 5 proposed stories and 15 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Sep 23, 2026
Proposed scale
5 proposed stories and 15 proposed dwelling units
Applicant of recordSee the 3 filings that name Fabrica Architecture Studio
FiledMay 20, 2025
Current recordRecorded as completed
Proposed scale5 stories
Recorded cost$199,987

What the filing says

A public-record reading of the proposed work.

Renovation of public hallways in res. 5 sty bldg: replace flooring, int. lighting, apt doors, paint. Repair and resurface exist. facades, scrape & paint exist. fire escape. No change in use, exits or occupancy

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 5-story walk-up apartment building built in 1930, with 15 homes, on a 2,100 sq ft lot.

Built
1930
Floors
5
Residential units
15
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
C6-2A
Lot area
2,100 sq ft
Building area
7,790 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 26, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01225181-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01225181-I1
BIN
1013819
BBL
1007660060
Review type
Standard Plan Examination
Existing stories
5
Proposed stories
5
Existing dwelling units
15
Proposed dwelling units
15
General construction