NYC DOB record · M01449001-I1

229 East 12 Street

229 East 12 Street, Manhattan, NY 10003

Alteration filing in East Village, Manhattan. The latest DOB status is permit issued.

A permit has been issued for this filing. It may cover part of the work rather than all of it. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01449001-I1

229 East 12 Street

Manhattan, NY 10003

Alteration filing · status dated Oct 8, 2026

Current record
Approved
Proposed scale
7 stories
Dwelling units
37
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01449001-I1 as a alteration filing at 229 East 12 Street, Manhattan, NY 10003. Its latest published status category is Approved, dated Oct 8, 2026. The filing records 7 proposed stories and 37 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 8, 2026
Proposed scale
7 proposed stories and 37 proposed dwelling units
Applicant of recordSee the 37 filings that name Pve Engineering
FiledSep 21, 2026
Current recordApproved
Proposed scale7 stories
Recorded cost$55,000

What the filing says

A public-record reading of the proposed work.

Remove existing boiler chimney at rear facade and replace wiith new chimney at inner court facade. exisiting boiler and gas piping to remain. no change in use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 7-story elevator apartment building built in 1920, with 35 homes, on a 5,111 sq ft lot.

Built
1920
Floors
7
Residential units
35
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R8B
Lot area
5,111 sq ft
Building area
27,215 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 14, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01449001-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Issued.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 85,681 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01449001-I1
BIN
1006875
BBL
1004680046
Review type
Standard Plan Examination
Existing stories
7
Proposed stories
7
Existing dwelling units
37
Proposed dwelling units
37
General construction