NYC DOB record · X01470357-I1

22A Edgewater Park

22A Edgewater Park, Bronx, NY 10465

Alteration filing in Throgs Neck-Schuylerville, Bronx. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 16, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01470357-I1

22A Edgewater Park

Bronx, NY 10465

Alteration filing · status dated Oct 14, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01470357-I1 as a alteration filing at 22A Edgewater Park, Bronx, NY 10465. Its latest published status category is Approved, dated Oct 14, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 14, 2026
Proposed scale
Not stated in this filing
Applicant of recordSee the 266 filings that name Parker And West Engineering, PLLC
FiledOct 9, 2026
Current recordApproved
Proposed scaleNot specified
Recorded cost$24,750

What the filing says

A public-record reading of the proposed work.

Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 16, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01470357-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 81,398 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01470357-I1
BIN
2095971
BBL
2055170101
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
Empty in the source
Proposed dwelling units
Empty in the source
Solar work