What the filing says
A public-record reading of the proposed work.
Proposed support of excavation work filing #q01035420-s3 in conjunction with g/c filing #q01035420-i1
Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 7-story elevator apartment building built in 2025, with 7 homes, on a 2,888 sq ft lot.
- Built
- 2025
- Last altered
- 2024
- Floors
- 7
- Residential units
- 7
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R6A
- Lot area
- 2,888 sq ft
- Building area
- 8,715 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 30, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 2 notices on file; the most recent was issued Aug 12, 2023.
- Construction
Issued Aug 12, 2023 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME OF INSP ECTION BOSERVED ROOF IN STATE OF DISREPAIR COVERED WITH BLUE TARP AND OPEN WINDWOS AT THE REAR OF PROPERTY REVEALS SOME INTERIOR STRUCTURAL FAILURE
- Construction
Issued Aug 12, 2023 — FAILURE TO AMINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME OF INSP ECTION OBSERVED ROOF IN A STATE OF DISREAPAIR COVEREED WITH BLUE TARP AND OPEN WINDOW AT REAR OF PROPERTY REVEALLS SOME STRUCTURAL FAILURE A T INTERIRO
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 29, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01035420-P5.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01035420-P5
- BBL
- 4005720031
- Postal code
- 11102 · 148 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- 7
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- 7








