NYC DOB record · M01229853-I1

23 East 74 Street

23 East 74 Street, Manhattan, NY 10021

Alteration filing in Upper East Side-Carnegie Hill, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 2, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01229853-I1

23 East 74 Street

Manhattan, NY 10021

Alteration filing · status dated Aug 28, 2026

Current record
Approved
Proposed scale
16 stories
Dwelling units
142
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01229853-I1 as a alteration filing at 23 East 74 Street, Manhattan, NY 10021. Its latest published status category is Approved, dated Aug 28, 2026. The filing records 16 proposed stories and 142 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Aug 28, 2026
Proposed scale
16 proposed stories and 142 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1041681Applicant of recordSee the 1 filings that name Office Of Objects Architecture PLLC
FiledMay 22, 2025
Current recordApproved
Proposed scale16 stories
Recorded cost$250,000

What the filing says

A public-record reading of the proposed work.

General construction associated with exterior renovations to existing apartment 14 ABCDE. No change in occupancy, use or egress.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 16-story condominium built in 1925, with 83 homes, on a 7,151 sq ft lot.

Built
1925
Floors
16
Residential units
83
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
C5-1
Lot area
7,151 sq ft
Building area
91,399 sq ft
Historic district
Upper East Side Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 12, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 5 open notices on record for this building, out of 57 notices on file; the most recent was issued Apr 1, 2026.

  • Construction

    Issued Apr 1, 2026 — THIRD FLOOR APARTMENT, LIGHT FIXTURES AND GENERAL WIRING IN HALLWAY , BEDROOM AND KITCHEN AREA DAMAGED DUE TO FIRE.

  • Construction

    Issued Mar 15, 2024 — THE DEPT. OF BUILDINGS ORDERS THAT YOU STOP ALL WORK UNDER PERMITS ISSUED IN CONNECTION WITH APPLICATION #120716742. THE APPLICATION OF RECORD HAS INFORMED THE DEPARTMENT THAT SHE OR HE HAS WITHDRAWN FROM THE PROJECT. STOP ALL WORK IMMEDIATELY AND MAKE THE SITE SAFE. UNABLE TO DETERMINE % OF WORK COMPLETED.

  • Landmark

    Issued Sep 30, 2009

  • 2 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 11, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01229853-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01229853-I1
BBL
1013897501
Review type
Standard Plan Examination
Existing stories
16
Proposed stories
16
Existing dwelling units
142
Proposed dwelling units
142
General construction