231 East 117 Street

231 East 117 Street, Manhattan, NY 10035

Alteration filing in East Harlem (North), Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 12, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01290365-S2

231 East 117 Street

Manhattan, NY 10035

Alteration filing · status dated Sep 9, 2026

Current record
Recorded as completed
Proposed scale
60 stories
Dwelling units
35
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01290365-S2 as a alteration filing at 231 East 117 Street, Manhattan, NY 10035. Its latest published status category is Recorded as completed, dated Sep 9, 2026. The filing records 60 proposed stories and 35 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Sep 9, 2026
Proposed scale
60 proposed stories and 35 proposed dwelling units
Complete building dossierView all 3 filings associated with BIN 1052617Applicant of recordSee the 221 filings that name New York Engineering ASSOC., P.C.
FiledSep 29, 2025
Current recordRecorded as completed
Proposed scale60 stories
Recorded cost$25,000

What the filing says

A public-record reading of the proposed work.

Install chimney liner.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story walk-up apartment building built in 1910, with 35 homes, on a 5,046 sq ft lot.

Built
1910
Floors
6
Residential units
35
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R7A
Lot area
5,046 sq ft
Building area
22,332 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 12, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 9 open notices on record for this building, out of 16 notices on file; the most recent was issued Nov 8, 2019.

  • Low pressure boiler

    Issued Nov 8, 2019 — VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT

  • Fail to certify class

    Issued Dec 27, 2017 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

  • Fail to certify class

    Issued Dec 27, 2017 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

  • 6 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01290365-S2.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01290365-S2
BBL
1016670016
Review type
Standard Plan Examination
Existing stories
60
Proposed stories
60
Existing dwelling units
35
Proposed dwelling units
35
General construction