What the filing says
A public-record reading of the proposed work.
Application filed for removal of all plumbing fixtures; domestic/sanitary/vent lines; to building service entry locations as per drawings filed herewith. Vacant Building.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story walk-up apartment building built in 1886, with 11 homes, on a 2,043 sq ft lot.
- Built
- 1886
- Floors
- 3
- Residential units
- 11
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R8B
- Lot area
- 2,043 sq ft
- Building area
- 3,120 sq ft
- Historic district
- West End-Collegiate Historic District Extension
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 27, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 12 open notices on record for this building, out of 18 notices on file; the most recent was issued Sep 26, 2024.
- Construction
Issued Sep 26, 2024 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED AT EXP#1 (S.ELEV) DETERIORATING FACADE WITH CONDITIONS OF SEVERITY SUCH AS:LOOSE/RUSTED METAL CORNICE/FLASHING;OPEN/MISSING MORTAR JOINTS B/W BRICKS & STONES; DAMAGED WINDOW FRAMING MISSING/BROKEN WINDOW & DAMAGE ROOF SHINGLES & LOOSE/HANGING CEILING @3FL.REMEDY: FIX AND/OR REPLACE
- Construction
Issued May 1, 2024 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.DETERIORATING FACADE AT EXP#1(SOUTH ELEV.)WITH CONDITIONS OF SEVERITY.LOOSE/RUSTED METAL CORNICE.OPEN/MISSING MORTAR JOINTS B/W STONES/BRICK DAMAGED WIND WINDOW FRAMING;MISSING/BROKEN WINDOW,DAMAGED ROOF SHINGLES;ALSO LOOSE HANGING CEILING AT 3RD FLR.REMEDY:FIX AND/OR REPLACE
- Construction
Issued Jan 3, 2024 — EMERGENCY WORK ORDER DUE TO UNSAFE CONDITIONS OBSERVED AS FOLLOWS: DAMAGED/MISSING MORTAR JOINTS;MISSING WINDOWS; DAMAGED/CORNICE AND SPALLED STONE WORK. REMEDY:IMMEDIATELY REPAIR ALL DEFECTIVE CONDITIONS UNDER DIRECT SUPERVISION OF LICENSED PROFESSIONAL
9 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 25, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01440944-S1.
- Current status updated02
The latest recorded filing status is “Objections.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 88,832 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01440944-S1
- BIN
- 1030723
- BBL
- 1011660014
- Postal code
- 10023 · 902 filings
- Review type
- Standard Plan Examination
- Existing stories
- 4
- Proposed stories
- 4
- Existing dwelling units
- 12
- Proposed dwelling units
- 12








