What the filing says
A public-record reading of the proposed work.
Installation of temporary overhead protection as per plans. no change in use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 7-story elevator apartment building built in 1922, with 20 homes, on a 7,500 sq ft lot.
- Built
- 1922
- Last altered
- 2025
- Floors
- 7
- Residential units
- 20
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R7A
- Lot area
- 7,500 sq ft
- Building area
- 36,200 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 22, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 44 notices on file; the most recent was issued Oct 15, 2025.
- Construction
Issued Oct 15, 2025 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.OBSERVED AT EXP3 EAST ELEV.DEGRADED MORTAR JOINTS AND SPALLING BRICKS AT MANY LOCATIONS .CRACK JOINT IN EXP1 CORNER OF EXP2 AT 7TH FLOOR.REMEDY:REPAIR AND/OR REPLACE
- Construction
Issued Dec 5, 2024 — STRUCTURE RENDERED NON COMPLIANT . DAMAHES OBSERVED TO HAVE BEEN CAUSE DDUE TO A VEHICLE IMPACTING SIDE WALK SHED KNOCKING APPROXIMATELY 8 V ERTICALLY SUPPORT OUT OF POSITION
- Hazardous condition (facade)
Issued Oct 8, 2021 — CYCLE 8B UNSAFE REPORT FILED
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 22, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X00494932-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded04
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 23 days of being filed and a quarter take longer than 4 months, measured across 99,692 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X00494932-I1
- BBL
- 2031870007
- Postal code
- 10468 · 365 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0