What the filing says
A public-record reading of the proposed work.
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the NYC code 2022. no change in use, occupancy or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 8-story office building built in 1920, on a 1,501 sq ft lot.
- Built
- 1920
- Last altered
- 1987
- Floors
- 8
- Residential units
- 0
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- M1-5
- Lot area
- 1,501 sq ft
- Building area
- 12,008 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 18, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 6 open notices on record for this building, out of 35 notices on file; the most recent was issued Feb 22, 2023.
- No report and / or late filing (facade)
Issued Feb 22, 2023 — FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
- No report and / or late filing (facade)
Issued Jul 31, 2018 — FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018
- Emergency
Issued Mar 31, 2008
3 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 18, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01366789-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01366789-I1
- BIN
- 1002365
- BBL
- 1001980029
- Postal code
- 10013 · 385 filings
- Review type
- Professional Certification
- Existing stories
- 8
- Proposed stories
- 8
- Existing dwelling units
- 8
- Proposed dwelling units
- 8