What the filing says
A public-record reading of the proposed work.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story care home built in 1929, on a 3,422 sq ft lot.
- Built
- 1929
- Floors
- 2
- Residential units
- 0
- Building type
- Care home
- Land use
- Public facilities and institutions
- Zoning district
- R7-1
- Lot area
- 3,422 sq ft
- Building area
- 3,450 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 7, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 3 notices on file; the most recent was issued Jul 10, 2026.
- Construction
Issued Jul 10, 2026 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AS NOTED AT TH E TIME OF INSPECTION,OBSERVED ON EXP1 WEST ELEV,CRACKS IN PARAPET BRIC K WORK,SAGGING,CORRDED METAL LENTELS ON 2ND FLOOR.CRACK IN STUCCO AT P ARAPET.EXP3 EAST ELEV,ERODING BRICK WORK AT 2ND FLOOR.EXP4 SOUTH ELEV, CRACK IN PARAPET MASONRY.REMEDY:REPAIR AND/OR REPLACE MASONRY WORK
- Construction
Issued Oct 9, 2024 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT THE TIME OF INSPECTION, OBSERVED ON EXPOSURE #1 WEST ELEV SEVERAL CORRODED,SAGGING METAL LINTELS ON 2FL W/CRACKED & MISSING MORTAR JOINTS, LINTELS SIT ON BRICKS;VERTICAL CRACKS IN BRICKS MORTAR JOINTS @ PARAPET,CRACKS IN PARAPET STUCCO. REMEDY: REPAIR AND/OR REPLACE DAMAGE FACADE
- Construction
Issued Jun 21, 2024 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AT TIME OF INS PECTION OBSERVED AT PARAPET LEVEL OF EXP1 WEST ELEV.OBSERVED CRACKS LO OSE BRICKS MORTAR JOINTS THROUGH OUT THE PARAPET AND AT DIFFERENT LEVE LS OF FACADE.REMEDY:REPAIR AND/OR REPLACE
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 7, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X00080712-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X00080712-I1
- BIN
- 2013432
- BBL
- 2031460015
- Postal code
- 10458 · 254 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source








