NYC DOB record · X01431046-I1

2325 University Avenue

2325 University Avenue, Bronx, NY 10468

Alteration filing in University Heights (North)-Fordham, Bronx. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 23, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01431046-I1

2325 University Avenue

Bronx, NY 10468

Alteration filing · status dated Oct 21, 2026

Current record
Approved
Proposed scale
6 stories
Dwelling units
48
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01431046-I1 as a alteration filing at 2325 University Avenue, Bronx, NY 10468. Its latest published status category is Approved, dated Oct 21, 2026. The filing records 6 proposed stories and 48 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 21, 2026
Proposed scale
6 proposed stories and 48 proposed dwelling units
Applicant of recordSee the 7 filings that name West Hudson Engineering P.C.
FiledJul 21, 2026
Current recordApproved
Proposed scale6 stories
Recorded cost$86,000

What the filing says

A public-record reading of the proposed work.

Bulkhead repairs as indicated on the drawings.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story elevator apartment building built in 1924, with 49 homes, on a 11,250 sq ft lot.

Built
1924
Last altered
1992
Floors
6
Residential units
49
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R7-1
Lot area
11,250 sq ft
Building area
39,792 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 23, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 10 open notices on record for this building, out of 32 notices on file; the most recent was issued Jun 30, 2026.

  • Construction

    Issued Jun 30, 2026 — FAILURE TO COMPLY WITH COMMISSIONER'S ORDER:DOB VIOLATION #110625CLL20 701MK REQUIRED THE IMMEDIATE 100% HANDS ON INSPECTION OF ALL FACADES B Y A PE/RA AND SUBMIT A REPORT TO FACADES IMMEDIATELY.AS OF 6/30/26,NO HANDS ON INSPECTION REPORT SUBMITTED TO FACADES UNIT.REMEDY:COMPLY WIT H DOB VIOLATION #110625CLL20701MK IMMEDIATELY

  • Construction

    Issued Nov 14, 2025 — EMERGENCY WORK ORDER.STAIR BULKHEAD ROOFNG PARTIALLY DTACHD&FELL, CAUSNG EXP1(EAST)PARAPET TO PARTIALLY CLLPSE ONTO 1STFL LOBBY&FRNT YRD.THE REMAIND OF THE BULKHEAD ROOF IS OF SIMILAR CONSTRUCTION.IMMED COMPLY W/COMMISSIONER ORDER #350307

  • Immediate

    Issued Nov 6, 2025 — PROVIDE APPROXIMATELY 30' X 12' OF SIDEWALK SHED @ EXPO#1 TO COVER THE FRONT ENTRY DOOR SETBACK & PROVIDE OVERHEAD PROTECTION OVER THE FRONT VESTIBULE TO SAFEGUARD THE PUBLIC AND PROPERTY

  • 7 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 23, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01431046-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 85,681 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01431046-I1
BIN
2014743
BBL
2032180052
Review type
Standard Plan Examination
Existing stories
6
Proposed stories
6
Existing dwelling units
48
Proposed dwelling units
48
General constructionStructural work