What the filing says
A public-record reading of the proposed work.
Installation and use of the temporary shanty as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5.5-story other built in 1905, on a 4,900 sq ft lot.
- Built
- 1905
- Floors
- 5.5
- Residential units
- 0
- Building type
- Other
- Land use
- Public facilities and institutions
- Zoning district
- R10
- Lot area
- 4,900 sq ft
- Building area
- 20,885 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 13, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 13 notices on file; the most recent was issued May 27, 2025.
- Construction
Issued May 27, 2025 — FAILURE TO COMPLY WITH COMMISSIONER'S ORDER 342005-032525PI10601SB DATED 3/25/25 REQUIRING OWNER TO START BLDG REPAIRS UNDER PERMIT. AS OF 5/27/25 THERE ARE NO JOBS FILED IN BIS OR DOBNOW TO REPAIR BLDG IMMED COMPLY WITH COMMISSIONER'S ORDER 342005-032525PI10601SB TO REPAIR THE BLDG UNDER PERMIT
- Construction
Issued Mar 25, 2025 — FAILURE TO MAINTAIN BLDG IN A CODE COMPLIANT MANNER.OBSERVED AT EXPOSURE 1,SPALLED/CRACKED DECORATING STONE ABOVE MAIN ENTRANCE & SPALLING/CRACKED SILLS AT 3RD FLOOR.OWNR TO IMMED RTAIN NYSPE TO EVAL THE ENT BLDG,DETERMINE THE STRCTRL STBILITY&PREPARE/FILE RPAIR DWGS BLDG TO RPAIRD
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 30, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01478599-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 95,944 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01478599-I1
- BBL
- 1008670023
- Postal code
- 10016 · 1030 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0