NYC DOB record · M01478599-I1

233 Madison Avenue

233 Madison Avenue, Manhattan, NY 10016

Alteration filing in Midtown-Times Square, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 30, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01478599-I1

233 Madison Avenue

Manhattan, NY 10016

Alteration filing · status dated Oct 28, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01478599-I1 as a alteration filing at 233 Madison Avenue, Manhattan, NY 10016. Its latest published status category is Approved, dated Oct 28, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 28, 2026
Proposed scale
Not stated in this filing
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1017198Applicant of recordSee the 662 filings that name Rigid Structural Design, LLC
FiledOct 27, 2026
Current recordApproved
Proposed scaleNot specified
Recorded cost$3,000

What the filing says

A public-record reading of the proposed work.

Installation and use of the temporary shanty as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 5.5-story other built in 1905, on a 4,900 sq ft lot.

Built
1905
Floors
5.5
Residential units
0
Building type
Other
Land use
Public facilities and institutions
Zoning district
R10
Lot area
4,900 sq ft
Building area
20,885 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 13, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 2 open notices on record for this building, out of 13 notices on file; the most recent was issued May 27, 2025.

  • Construction

    Issued May 27, 2025 — FAILURE TO COMPLY WITH COMMISSIONER'S ORDER 342005-032525PI10601SB DATED 3/25/25 REQUIRING OWNER TO START BLDG REPAIRS UNDER PERMIT. AS OF 5/27/25 THERE ARE NO JOBS FILED IN BIS OR DOBNOW TO REPAIR BLDG IMMED COMPLY WITH COMMISSIONER'S ORDER 342005-032525PI10601SB TO REPAIR THE BLDG UNDER PERMIT

  • Construction

    Issued Mar 25, 2025 — FAILURE TO MAINTAIN BLDG IN A CODE COMPLIANT MANNER.OBSERVED AT EXPOSURE 1,SPALLED/CRACKED DECORATING STONE ABOVE MAIN ENTRANCE & SPALLING/CRACKED SILLS AT 3RD FLOOR.OWNR TO IMMED RTAIN NYSPE TO EVAL THE ENT BLDG,DETERMINE THE STRCTRL STBILITY&PREPARE/FILE RPAIR DWGS BLDG TO RPAIRD

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 30, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01478599-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 95,944 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01478599-I1
BBL
1008670023
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
0