What the filing says
A public-record reading of the proposed work.
Apartment renovation of apt 12r. existing bathroom to remain. existing hardwood flooring to remain. renovatedkitchenette. no facade work. no work in public areas. no change to use egress nor occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 17-story condominium built in 1931, with 339 homes, on a 36,740 sq ft lot.
- Built
- 1931
- Floors
- 17
- Residential units
- 339
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- R8A
- Lot area
- 36,740 sq ft
- Building area
- 338,689 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 18, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 107 notices on file; the most recent was issued Sep 6, 2019.
- (other bldgs types) - elevator affirmation of
Issued Sep 6, 2019 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
- Construction
Issued May 9, 2017 — FM IN SAFE COND PARTY WALL SHARED W/ADJ BLDG 240 E.23RD ST. PARTY WALL IS IN DISREPAIR.THERE ARE NOT VISUAL TIES BRACING JOISTS @240 E.23RD ST. AT EXT OF PARTY WALL.REMEDY:OWNER ENGAGE NYSPE&CONT'R TO REPAIR PARTY WALL&VERIFY THAT TIES/BRACE OF PARTY WALL ARE IN PLACE OR NOT IN PLACE.JOB&VERIFICATION TO BE SIGNED OFF NO LATER THAN 07/14/17
- Local law 10/80 - facade
Issued Jul 1, 1997
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01455955-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01455955-I1
- BIN
- 1019731
- BBL
- 1009037502
- Postal code
- 10010 · 311 filings
- Review type
- Standard Plan Examination
- Existing stories
- 15
- Proposed stories
- 15
- Existing dwelling units
- 333
- Proposed dwelling units
- 333








