NYC DOB record · M01114689-I1

235 East 42 Street

235 East 42 Street, Manhattan, NY 10017

Alteration filing in Murray Hill-Kips Bay, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 2, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01114689-I1

235 East 42 Street

Manhattan, NY 10017

Alteration filing · status dated Aug 31, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
1
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01114689-I1 as a alteration filing at 235 East 42 Street, Manhattan, NY 10017. Its latest published status category is Approved, dated Aug 31, 2026. The filing records 1 proposed dwelling unit.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Aug 31, 2026
Proposed scale
1 proposed dwelling unit
The building, not the filingopen housing violations, what it sold for, the owner of record and every filing at BIN 1037552Applicant of recordSee the 5 filings that name Crimson Engineering
FiledSep 23, 2024
Current recordApproved
Proposed scale1 units
Recorded cost$20,400

What the filing says

A public-record reading of the proposed work.

Installation of 7,000 lb dual personnel/material hoist cars @ south courtyard as per plans during construction. hoist shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 37-story elevator apartment building built in 1960, with 884 homes, on a 37,657 sq ft lot.

Built
1960
Last altered
2025
Floors
37
Residential units
884
Building type
Elevator apartment building
Land use
Mixed residential and commercial
Zoning district
C5-3
Lot area
37,657 sq ft
Building area
728,739 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 22, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 28 open notices on record for this building, out of 166 notices on file; the most recent was issued Sep 1, 2026.

  • Construction

    Issued Sep 1, 2026 — STEEL HIGH-RISE UNDER ALT. W/ SIGNIFICANT DAMAGE & DEFORMATION.COLS 62&63 EXHIBITED SIGNS OF FAILURE, FL 21-22. COL REMOVAL UNDER M011442594. ADD'L INFO REQ'D.REMEDY:LABEL & MAINTAIN ALL PIECES ON SITE.SUBMIT DIAGRAM.OBTAIN DOB APPROVAL PRIOR TO TESTING OR REMOVING

  • Construction

    Issued Jul 9, 2026 — STEEL HIGH-RISE UNDER PERMITTED ALT. WITH SEVERE DAMAGE,DEFORMATION & COLLAPSE RISK.COLUMNS BUCKLING FL 21-22. REMEDY:RETAIN SIA TO INSPECT STRUCTURAL WORK SPECIFIED BY DESIGN APPLICANT AND APPROVED/ACCEPTED DOCUMENTS

  • Construction

    Issued Jul 9, 2026 — SHOP DWGS - STEEL HIGH-RISE UNDER PERMITTED ALT. COLUMNS BUCKLING FL 21-22. REMEDY:SUBMIT APPROVED/ACCEPTED STEEL SHOP DRAWINGS BY 7/16/26

  • 25 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 22, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01114689-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01114689-I1
BBL
1013160023
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
1
Proposed dwelling units
1