NYC DOB record · M01085203-S1

235 East 73 Street

235 East 73 Street, Manhattan, NY 10021

Alteration filing in Upper East Side-Lenox Hill-Roosevelt Island, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 19, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01085203-S1

235 East 73 Street

Manhattan, NY 10021

Alteration filing · status dated Sep 16, 2026

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
84
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01085203-S1 as a alteration filing at 235 East 73 Street, Manhattan, NY 10021. Its latest published status category is Recorded as completed, dated Sep 16, 2026. The filing records 84 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Sep 16, 2026
Proposed scale
84 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, the owner of record and every filing at BIN 1043992Applicant of recordSee the 38 filings that name CO.DE Consulting And Design, INC.
FiledFeb 13, 2025
Current recordRecorded as completed
Proposed scale84 units
Recorded cost$20,000

What the filing says

A public-record reading of the proposed work.

Cap and remove existing gas line. Replacement of existing plumbing fixtures with new.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 13-story elevator apartment building built in 1936, with 84 homes, on a 10,216 sq ft lot.

Built
1936
Last altered
1980
Floors
13
Residential units
84
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R8B
Lot area
10,216 sq ft
Building area
88,955 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 19, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 9 open notices on record for this building, out of 34 notices on file; the most recent was issued Jun 23, 2024.

  • Failure to submit

    Issued Jun 23, 2024 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023)

  • Failure to submit

    Issued Apr 22, 2023 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2022)

  • Failure to submit

    Issued Aug 21, 2022 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2021)

  • 6 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 18, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01085203-S1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01085203-S1
BBL
1014280017
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
84
Proposed dwelling units
84