What the filing says
A public-record reading of the proposed work.
Cosmetic renovation at 4th and 5th floor gsa office spaces. scope of works as shown in plans. no change in egress, occupancy or use.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 42-story elevator apartment building built in 1989, with 477 homes, on a 24,100 sq ft lot.
- Built
- 1989
- Floors
- 42
- Residential units
- 477
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- C6-5
- Lot area
- 24,100 sq ft
- Building area
- 475,327 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 22, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 68 notices on file; the most recent was issued Apr 3, 2026.
- Construction
Issued Apr 3, 2026 — EWO.OCCUPIED P.S. CONSISTING OF 3 STORIES.CRACKED.SPALLED CONCRETE BEAM/EXPOSED REBARS @ CEL LVL CAUSING IMMEDIATE HAZARD TO VEHICULAR/ PEDESTRIAN TRAFFIC. REMEDY:OWNER TO RETAIN NYS RDP TO DIRECT/SUPERVISE INSTALLATION SAFE MEAS.PROVIDE PROGRESS REPORT TO PARKINGSTRUCTURES@BUILDINGS.NYC.GOV. SAFE MEAS TO PROTECT UNSAFE AREAS
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 19, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01449859-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01449859-I1
- BBL
- 1010200005
- Postal code
- 10036 · 469 filings
- Review type
- Professional Certification
- Existing stories
- 40
- Proposed stories
- 40
- Existing dwelling units
- 455
- Proposed dwelling units
- 455