NYC DOB record · M01047583-I1

236 West 30 Street

236 West 30 Street, Manhattan, NY 10001

Alteration filing in Midtown South-Flatiron-Union Square, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 3, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01047583-I1

236 West 30 Street

Manhattan, NY 10001

Alteration filing · status dated Sep 30, 2026

Current record
Recorded as completed
Proposed scale
15 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01047583-I1 as a alteration filing at 236 West 30 Street, Manhattan, NY 10001. Its latest published status category is Recorded as completed, dated Sep 30, 2026. The filing records 15 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Sep 30, 2026
Proposed scale
15 proposed stories
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1014302Applicant of recordSee the 8 filings that name Craft Engineering Studio PLLC
FiledAug 30, 2024
Current recordRecorded as completed
Proposed scale15 stories
Recorded cost$34,991

What the filing says

A public-record reading of the proposed work.

Modification to existing Structural Systems as per plans filed herewith. No change in use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 14-story office building built in 1926, on a 5,110 sq ft lot.

Built
1926
Floors
14
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
M1-9A/R12
Lot area
5,110 sq ft
Building area
64,414 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 3, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 17 open notices on record for this building, out of 94 notices on file; the most recent was issued Aug 12, 2026.

  • Construction

    Issued Aug 12, 2026 — DUE TO THE WITHDRAWAL OF SPECIAL INSPECTOR, DEPARTMENT OF BUILDINGS ORDERS YOU TO STOP ALL WORK AND JOBS IN CONNECTION WITH APPLICATION #M01027817-I1 IMMEDIATELY.

  • Failure to post energy

    Issued Dec 1, 2023 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

  • Low pressure boiler

    Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION

  • 14 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 2, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01047583-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01047583-I1
BBL
1007790063
Review type
Professional Certification
Existing stories
15
Proposed stories
15
Existing dwelling units
0
Proposed dwelling units
0
Structural work