What the filing says
A public-record reading of the proposed work.
Interior renovation of partitions, ceilings and doors for apartment combination for unit 616-617. No change in use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 12-story condominium built in 1920, with 207 homes, on a 67,675 sq ft lot.
- Built
- 1920
- Floors
- 12
- Residential units
- 207
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- R10A
- Lot area
- 67,675 sq ft
- Building area
- 560,778 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 1, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 8 open notices on record for this building, out of 251 notices on file; the most recent was issued May 6, 2013.
- Elevator
Issued May 6, 2013
- Elevator
Issued Dec 6, 2012
- Elevator
Issued Jul 24, 2009
5 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01273498-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01273498-I1
- BBL
- 1012347503
- Postal code
- 10024 · 267 filings
- Review type
- Professional Certification
- Existing stories
- 13
- Proposed stories
- 13
- Existing dwelling units
- 222
- Proposed dwelling units
- 222








