What the filing says
A public-record reading of the proposed work.
The purpose of these plans is to provide shoring for the existing exterior framedconcrete slabs and beams due to deterioration of the existing structural elements. no change in egress, use, and occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story walk-up apartment building built in 1915, with 27 homes, on a 6,883 sq ft lot.
- Built
- 1915
- Floors
- 5
- Residential units
- 27
- Building type
- Walk-up apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- R8
- Lot area
- 6,883 sq ft
- Building area
- 26,882 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 22, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 19 open notices on record for this building, out of 22 notices on file; the most recent was issued Feb 11, 2026.
- Construction
Issued Feb 11, 2026 — OBSERVED INSTALLATION OF TEMPORARY WOODEN SHORING AT BASEMENT LEVEL, SUPPORTING EXTERIOR WALKWAY AT GROUND FLOOR LEADING TO BUILDING ENTRANCE. AREA SUPPORTED IS IN DISREPAIR WITH SEVERE SPALLING CONCRETE AND CORRODED/RUSTED REBAR EXPOSED. NO PERMITS OR JOB APPLICATIONS FILED WITH THE DEPT TO ATTEST TO ITS INSTALLATION AND AREA STRUCTURAL
- Failure to post energy
Issued Dec 1, 2023 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
- Fail to certify class
Issued Nov 22, 2023 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
16 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 22, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01467294-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 84,915 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01467294-I1
- BIN
- 2013582
- BBL
- 2031520032
- Postal code
- 10458 · 359 filings
- Review type
- Standard Plan Examination
- Existing stories
- 5
- Proposed stories
- 5
- Existing dwelling units
- 27
- Proposed dwelling units
- 27