What the filing says
A public-record reading of the proposed work.
TEMPORARY INSTALLATION OF ADJUSTABLE SUSPENDED SCAFFOLD FOR FACADE INSPECTION & REPAIR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Designated Primary Site Supervisor: Tomasz Gawkowksi
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 35-story elevator apartment building built in 1974, with 208 homes, on a 26,865 sq ft lot.
- Built
- 1974
- Floors
- 35
- Residential units
- 208
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R9
- Lot area
- 26,865 sq ft
- Building area
- 297,425 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 25, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 60 notices on file; the most recent was issued Apr 25, 1991.
- Local law 10/81 -
Issued Apr 25, 1991 — 1
- Elevator
Issued Jun 12, 1990 — 03-FLOOR TILES 05-SADDLE 11- REPLACE DROP CELING 15-EXCESSIVE OPENING ON HOISTWAY DOORS 37- EXCESSIVE BOUNCING ON LANDING 74 TOE GUARD CEASE USE UNTIL ITEMS 15 AND 37 ARE CORRECTED
- Local law 10/81 -
Issued Oct 12, 1989 — 2
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 24, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01460422-I1.
- Current status updated02
The latest recorded filing status is “Pending QA Assignment.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01460422-I1
- BBL
- 1017870070
- Postal code
- 10035 · 154 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source