NYC DOB record · S01114675-I1

239 Barnard Avenue

239 Barnard Avenue, Staten Island, NY 10307

New building filing in Tottenville-Charleston, Staten Island. The latest DOB status is co issued.

A Certificate of Occupancy has been issued, which is what makes a space legal to occupy. What every status means

Recorded as completedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Sep 15, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · S01114675-I1

239 Barnard Avenue

Staten Island, NY 10307

New building · status dated Sep 10, 2026

Current record
Recorded as completed
Proposed scale
3 stories
Dwelling units
2
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing S01114675-I1 as a new building at 239 Barnard Avenue, Staten Island, NY 10307. Its latest published status category is Recorded as completed, dated Sep 10, 2026. The filing records 3 proposed stories and 2 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Recorded as completed
Latest status date
Sep 10, 2026
Proposed scale
3 proposed stories and 2 proposed dwelling units
The building, not the filingopen housing violations and every filing at BIN 5176897Applicant of recordSee the 59 filings that name Joseph M. Morace, A.I.A., Architect
FiledDec 13, 2024
Current recordRecorded as completed
Proposed scale3 stories
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Proposed detached two family residence with two accessory off street parking spaces.

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story two-family home built in 2025, on a 4,472 sq ft lot.

Built
2025
Floors
2
Residential units
2
Building type
Two-family home
Land use
One and two family homes
Zoning district
R3X
Lot area
4,472 sq ft
Building area
2,646 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 15, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building. 1 notice is on file, all with a recorded resolution.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing S01114675-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “CO Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
S01114675-I1
BBL
Empty in the source
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
3
Existing dwelling units
Empty in the source
Proposed dwelling units
2
General constructionStructural workFoundation workEarthwork