What the filing says
A public-record reading of the proposed work.
Install of new 2-hr fire rated party wall at exposure #2 to be supported by the temporary shoring to resolve full vacate order. filed in conjunction with adjacent properties party wall repair application (2407 dean street) b01192936-p1. part. wall demo.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story two-family home built in 1901, on a 2,143 sq ft lot.
- Built
- 1901
- Floors
- 3
- Residential units
- 2
- Building type
- Two-family home
- Land use
- One and two family homes
- Zoning district
- R6
- Lot area
- 2,143 sq ft
- Building area
- 2,082 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 29, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 8 notices on file; the most recent was issued Nov 15, 2024.
- Construction
Issued Nov 15, 2024 — FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.BLDG SUFFRD A 4ALARM FIRE ON 8/27/24.ERT ISSUED A FULL VACATE ORDR ON THE SAME DAY BLDG SFFRD FRM FAILURE TO MAINTAIN CONDITION ON 2NDFL TO ROOF.IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER 343787 (082824FEU31603ZT)TO REPAIR BLDG UNDR PERMIT
- Construction
Issued Aug 28, 2024 — FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.BLDG SFFRD A 4ALARM FIRE ON 8/27/24.ERT ISSUED A FULL VACATE ORDR ON THE SAME DAY BLDG SFFRD FRM FAILURE TO MAINTAIN CNDITION ON 2NDFL TO ROOF.OWNR TO IMMED RTAIN NYSPE TO EVAL THE ENT BLDG,DTRMINE STRCTRL STBTILITY&PREPARE/FILE RPAIR DWGS,BLDG TO BE RPAIRD UNDR PRMT
- Construction
Issued Aug 27, 2024 — STRUCTURE RENDERED NON COMPLIANT DUE TO FIRE ORIGINATING FROM 2411 DEA N STREET, CAUSING EXTENSIVE FIRE AND WATER DAMAGE.THROUGHOUT. ROOF OPE N TO THE ELEMENTS WITH CHARRING TO STRUCTURAL MEMBERS
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 26, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01105150-S2.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01105150-S2
- BBL
- 3014430052
- Postal code
- 11233 · 2267 filings
- Review type
- Standard Plan Examination
- Existing stories
- 3
- Proposed stories
- 3
- Existing dwelling units
- 2
- Proposed dwelling units
- 2