NYC DOB record · B00628416-I1

241 Taaffe Place

241 Taaffe Place, Brooklyn, NY 11205

Alteration filing in Bedford-Stuyvesant (West), Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00628416-I1

241 Taaffe Place

Brooklyn, NY 11205

Alteration filing · status dated Dec 2, 2022

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
83
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00628416-I1 as a alteration filing at 241 Taaffe Place, Brooklyn, NY 11205. Its latest published status category is Recorded as completed, dated Dec 2, 2022. The filing records 83 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Dec 2, 2022
Proposed scale
83 proposed dwelling units
The building, not the filingwhat it sold for and every filing at BIN 3055136Applicant of recordSee the 1 filings that name James R. Skowronski
FiledDec 20, 2021
Current recordRecorded as completed
Proposed scale83 units
Recorded cost$83,800

What the filing says

A public-record reading of the proposed work.

Installation of DISH telecommunications site on ROOF. No change to use, egress, or occupancy. All in compliance with TPPN 5/98.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 7-story elevator apartment building built in 1935, with 83 homes, on a 16,898 sq ft lot.

Built
1935
Last altered
2000
Floors
7
Residential units
83
Building type
Elevator apartment building
Land use
Mixed residential and commercial
Zoning district
R7A
Lot area
16,898 sq ft
Building area
124,598 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 14 open notices on record for this building, out of 73 notices on file; the most recent was issued Aug 3, 2026.

  • Construction

    Issued Aug 3, 2026 — DOB VIOLATION ISSUED FOR FAILURE TO MAINTAIN AT TIME OF INSPECTION NOTED WATER MITIGATION WORK IN PROGRESS DUE TO LEAK ON STANDPIPE LOCATED IN INTERIOR STAIR 6TH FLOOR OF BUILDING. OBSERVED AREAS OF BROWN WATER STAINING AT MULTIPLE LOCATIONS WITH STANDING WATER IN THE PROCESS OF BEING EXTRACTED

  • Failure to submit

    Issued Jun 23, 2024 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023)

  • Failure to submit

    Issued Apr 22, 2023 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2022)

  • 11 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00628416-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 70,325 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00628416-I1
BBL
3019250001
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
83
Proposed dwelling units
83
antenna