NYC DOB record · B00483059-I1

2411 64 Street

2411 64 Street, Brooklyn, NY 11204

New building filing in Bensonhurst, Brooklyn. The latest DOB status is co issued.

A Certificate of Occupancy has been issued, which is what makes a space legal to occupy. What every status means

Recorded as completedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00483059-I1

2411 64 Street

Brooklyn, NY 11204

New building · status dated Jan 23, 2025

Current record
Recorded as completed
Proposed scale
4 stories
Dwelling units
10
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00483059-I1 as a new building at 2411 64 Street, Brooklyn, NY 11204. Its latest published status category is Recorded as completed, dated Jan 23, 2025. The filing records 4 proposed stories and 10 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Recorded as completed
Latest status date
Jan 23, 2025
Proposed scale
4 proposed stories and 10 proposed dwelling units
Complete building dossierView all 5 filings associated with BIN 3429591Applicant of recordSee the 151 filings that name Hpl Engineering P.C.
FiledMay 11, 2021
Current recordRecorded as completed
Proposed scale4 stories
Recorded cost$720,960

What the filing says

A public-record reading of the proposed work.

Erect 4 story with penthouse new building, for residential and community facility mixed use.

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 5-story condominium built in 2023, with 10 homes, on a 320 sq ft lot.

Built
2023
Last altered
2022
Floors
5
Residential units
10
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
R6A
Lot area
320 sq ft
Building area
9,104 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building. 1 notice is on file, all with a recorded resolution.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00483059-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “CO Issued.”

    04

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00483059-I1
BBL
3065617501
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
4
Existing dwelling units
Empty in the source
Proposed dwelling units
10
General construction