What the filing says
A public-record reading of the proposed work.
No work application. all work here is previously approved, permitted entire, and inspected under job 32031209, and is here refiled as an alt.2 under tppn0397. the work included merging two apartments on the same floor, removal of wall and one kitchen, rel
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story walk-up apartment building built in 1891, with 10 homes, on a 2,496 sq ft lot.
- Built
- 1891
- Last altered
- 1980
- Floors
- 5
- Residential units
- 10
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R6
- Lot area
- 2,496 sq ft
- Building area
- 7,450 sq ft
- Historic district
- Cobble Hill Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 4, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 5 notices on file; the most recent was issued May 15, 2014.
- Low pressure boiler
Issued May 15, 2014 — VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
- Local law 62/91 - boilers
Issued Aug 16, 1993
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 4, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00502472-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00502472-I1
- BIN
- 3003533
- BBL
- 3003120022
- Postal code
- 11201 · 3965 filings
- Review type
- Professional Certification
- Existing stories
- 5
- Proposed stories
- 5
- Existing dwelling units
- 10
- Proposed dwelling units
- 10