NYC DOB record · B00678394-S3

242 Carroll Street

242 Carroll Street, Brooklyn, NY 11231

Alteration filing in Carroll Gardens-Cobble Hill-Gowanus-Red Hook, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 23, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00678394-S3

242 Carroll Street

Brooklyn, NY 11231

Alteration filing · status dated Oct 20, 2026

Current record
Approved
Proposed scale
3 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00678394-S3 as a alteration filing at 242 Carroll Street, Brooklyn, NY 11231. Its latest published status category is Approved, dated Oct 20, 2026. The filing records 3 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 20, 2026
Proposed scale
3 proposed stories
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 3007547Applicant of recordSee the 2 filings that name Semmens Associates
FiledMar 17, 2022
Current recordApproved
Proposed scale3 stories
Recorded cost$7,987

What the filing says

A public-record reading of the proposed work.

Temporary egress plan

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 3-story educational building built in 1957, on a 65,639 sq ft lot.

Built
1957
Floors
3
Residential units
0
Building type
Educational building
Land use
Public facilities and institutions
Zoning district
R6B
Lot area
65,639 sq ft
Building area
114,000 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 23, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 49 notices on file; the most recent was issued Aug 15, 2001.

  • Elevator

    Issued Aug 15, 2001 — 3S5286

  • Construction

    Issued May 8, 2001 — HAZARDOUS

  • Local law 10/81 -

    Issued Jan 13, 1997

  • 1 further open notice is on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 22, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00678394-S3.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 91,085 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00678394-S3
BBL
3004490015
Review type
Standard Plan Examination
Existing stories
3
Proposed stories
3
Existing dwelling units
0
Proposed dwelling units
0
General construction