NYC DOB record · B00031954-I1

243 4 Avenue

243 4 Avenue, Brooklyn, NY 11215

Alteration filing in Park Slope, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 11, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00031954-I1

243 4 Avenue

Brooklyn, NY 11215

Alteration filing · status dated Nov 29, 2021

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00031954-I1 as a alteration filing at 243 4 Avenue, Brooklyn, NY 11215. Its latest published status category is Recorded as completed, dated Nov 29, 2021. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Nov 29, 2021
Proposed scale
Not stated in this filing
Complete building dossierView all 9 filings associated with BIN 3425188Applicant of recordSee the 718 filings that name Kz Engineering, P.C
FiledJun 13, 2018
Current recordRecorded as completed
Proposed scaleNot specified
Recorded cost$1

What the filing says

A public-record reading of the proposed work.

Installation of temporary exterior supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 12-story condominium built in 2018, with 19 homes, on a 5,459 sq ft lot.

Built
2018
Floors
12
Residential units
19
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
C4-4D
Lot area
5,459 sq ft
Building area
41,098 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00031954-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00031954-I1
BBL
3009587504
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
Empty in the source
Proposed dwelling units
Empty in the source