NYC DOB record · M01208368-I1

245 East 110 Street

245 East 110 Street, Manhattan, NY 10029

Alteration filing in East Harlem (North), Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 24, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01208368-I1

245 East 110 Street

Manhattan, NY 10029

Alteration filing · status dated Oct 22, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
30
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01208368-I1 as a alteration filing at 245 East 110 Street, Manhattan, NY 10029. Its latest published status category is Approved, dated Oct 22, 2026. The filing records 30 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 22, 2026
Proposed scale
30 proposed dwelling units
Applicant of recordSee the 68 filings that name Mumtaz Enterprises
FiledApr 22, 2025
Current recordApproved
Proposed scale30 units
Recorded cost$10,000

What the filing says

A public-record reading of the proposed work.

Installation of temporary shoring for window lintel and face brick regarding emergency work order control no - 341948. there will be no change in the use, egress, or occupancy under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story walk-up apartment building built in 1910, with 30 homes, on a 3,784 sq ft lot.

Built
1910
Last altered
1987
Floors
6
Residential units
30
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R7A
Lot area
3,784 sq ft
Building area
15,964 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 24, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 12 open notices on record for this building, out of 18 notices on file; the most recent was issued Nov 14, 2025.

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Construction

    Issued Sep 28, 2025 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME OF INSP ECTION OBSERVED AT ALL EXPOSURE BUILDING FACADE IN NEED OF REPAIR ALON G WITH PARAPET WALL AT ROOF LEVEL MISSING BRICK AND WALL BOWING SUBMIT ENGINEER REPORT EVALUATING THE CITED CONDITIONS WITH A REPAIR T IME FRAME TO ERTINSPECTIONS@BUILDINGS.NYC.GOV WITHING 7 DAYS

  • Construction

    Issued May 28, 2025 — FTM IN SAFE CONDITION/ADDITIONAL INFORMATION.EXP4 MASONRYWALL W/CRACKD BULGING&SEVERELY DETERIORATED MORTAR JOINT STEEL WINDOWLINTEL BULGING& INADEQUATE SUPPORTED @ VARIOUS WINDOWS.COMPLY WITH COMMISSIONER'S ORDER:DOB VIOLATION #040325CFEU1101PN (CONTROL #341948) IMMEDIATELY

  • 9 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 24, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01208368-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 86,497 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01208368-I1
BIN
1052463
BBL
1016600019
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
30
Proposed dwelling units
30