What the filing says
A public-record reading of the proposed work.
Replacement of existing telecommunications antennas with replacement of RRH units on roof. Removal/installation of cabinets on existing equipment platform on roof. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1941, with 78 homes, on a 20,815 sq ft lot.
- Built
- 1941
- Floors
- 6
- Residential units
- 78
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R6
- Lot area
- 20,815 sq ft
- Building area
- 82,542 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 1, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 6 open notices on record for this building, out of 71 notices on file; the most recent was issued Sep 9, 2025.
- Construction
Issued Sep 9, 2025 — FAILURE TO MAINTAIN.DAMAGED BY FIRE ON 9/8/25.ROOF OPEN.ROOF FRAMING IN PARTIALLY SEVERELY CHARRED.SEVERE WATER DAMAGE@11,12,&14 FLOOR UNITS.MISSING WINDOWS.EVALUATE BUILDING UNDER PERMIT.OBTAIN PERMIT BY 10/1/25 COMPLETE REPAIRS BY 12/1/25
- Construction
Issued Sep 9, 2025 — EMERGENCY WORK.DAMAGED BY FIRE ON 9/8/25.ROOF COCKLOFT SEVERELY DAMAGED OVER LINES 11,12,&14 ROOF SHEATHING MISSING&FRAMING CHARRED ROF OPEN.IMMED INSTALL TEMP ROOF UNDER DIRECT&CONTINUOUS SUPERVISION OF PE.SUBMIT REPORT TO XCELO@BUILDINGS.NYC.GOV W/IN 48 HRS
- Construction
Issued Sep 8, 2025 — AS PER FIRE MARSHALLS INDIVIDUAL WAS PERFORMING WORK ON ROOF WITH OPEN FLAME AND NO FIREGUARD PRESENT. FIRE HAS LEFT ROOF OPEN TO THE ELEMENTS AFFECTING APT'S #11, 12, AND 14 FROM F TO A AND ALSO APT#9F AND 10F.
3 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 26, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00011032-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Sign-off date recorded04
DOB lists a sign-off date for this filing.
- Current status updated05
The latest recorded filing status is “LOC Issued.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00011032-I1
- BBL
- 3050440068
- Postal code
- 11225 · 1507 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source