What the filing says
A public-record reading of the proposed work.
Masonry and terracotta repairs. No change in use occupancy or egress.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 9-story elevator apartment building built in 1912, with 65 homes, on a 8,284 sq ft lot.
- Built
- 1912
- Last altered
- 1980
- Floors
- 9
- Residential units
- 65
- Building type
- Elevator apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- C6-5
- Lot area
- 8,284 sq ft
- Building area
- 48,368 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 29 notices on file; the most recent was issued May 7, 2025.
- Failure to correct swarmp conditions (facade)
Issued May 7, 2025 — CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS
- No report and / or late filing (facade)
Issued Feb 22, 2024 — FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
- Elevator
Issued Nov 19, 2021
1 further open notice is on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M08023092-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M08023092-I1
- BIN
- 1024816
- BBL
- 1010230006
- Postal code
- 10019 · 427 filings
- Review type
- Professional Certification
- Existing stories
- 9
- Proposed stories
- 9
- Existing dwelling units
- 80
- Proposed dwelling units
- 80