NYC DOB record · B00572718-P1

248 Palmetto Street

248 Palmetto Street, Brooklyn, NY 11221

Alteration filing in Bushwick (East), Brooklyn. The latest DOB status is filing withdrawn.

The applicant withdrew this filing, so it is not going forward. What every status means

Closed or withdrawnAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00572718-P1

248 Palmetto Street

Brooklyn, NY 11221

Alteration filing · status dated Aug 10, 2023

Current record
Closed or withdrawn
Proposed scale
3 stories
Dwelling units
3
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00572718-P1 as a alteration filing at 248 Palmetto Street, Brooklyn, NY 11221. Its latest published status category is Closed or withdrawn, dated Aug 10, 2023. The filing records 3 proposed stories and 3 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Closed or withdrawn
Latest status date
Aug 10, 2023
Proposed scale
3 proposed stories and 3 proposed dwelling units
The building, not the filingEvery filing at BIN 3076627, with the parcel and violation recordApplicant of recordSee the 88 filings that name J.K.DESIGN
FiledAug 8, 2022
Current recordClosed or withdrawn
Proposed scale3 stories
Recorded cost$401,000

What the filing says

A public-record reading of the proposed work.

Interior renovation of existing 3 stories and cellar, 3 family dwellings. New drywall partitions and plumbing fixtures as per plans. no change in use,egress, or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00572718-P1.

    01
  2. Current status updated

    The latest recorded filing status is “Filing Withdrawn.”

    02

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 70,325 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00572718-P1
BBL
3033520016
Review type
Standard Plan Examination
Existing stories
3
Proposed stories
3
Existing dwelling units
3
Proposed dwelling units
3
General constructionStructural workmechanical